1. As with any operating system modification, feel free to back up your data.
2. Remain connected to AC power and hard wired to the corporate network during the installation.
April 18, 2008: The Windows Vista SP1 update notice will change to ‘Critical’ in Windows Update. All Vista clients connecting to Windows Update will receive an advertisement that the Windows Vista SP1 update download and installation has been initiated.